Technical sepcifications & project description
Partner: REGULUS ROMTHERM
Project: Wood door factory in Oradea
Product: PROFI BIO 150
Installed power: 150kW
Fuel: resturi de MDF
Fuel storage system: fuel tank made by the user, with a feeder screw connected directly on the boiler
Installation: Heating distribution with fan-coils for production area, heating circuit for offices and auxiliary spaces
Project requirements: Heating of a production plant of a factory with MDF residues and other materials resulting form the production process, with the utmost automatization and reliability.
Solution offered by THERMOSTAHL:
To satisfy the project requirements, our proposal was installation of a biomass boiler with power 150 kW. In order to offer as little as possible human interaction for the boiler function, we chose to offer a boiler with a fuel feeder, automated by means of automatic ignition, safety kit, pneumatic cleaning of the tubes and automatic ash extraction system.